This project facilitated the design and construction of 1,900 lf of new 24-inch water line and 500 lf of 8-inch water line for new development adjacent to SH 183 and Loop 12 in Irving. The effort required close coordination with an adjacent developer to avoid impacts to the proposed parking lot and detention pond. The 24-inch line will also bring about a future crossing of Loop 12 to further improve the interconnected nature of the City’s water distribution system.
Halff’s services included survey, SUE, preparation of temporary construction easements, and bid and construction phase services.